ADU Construction Experts Serving Northridge
As a San Fernando Valley contractor, we regularly work in Northridge — home of CSUN and generous mid-century lots — and handle local permitting and inspections for you.
Accessory dwelling units built from the ground up — design, permits, foundation, framing, and finish. Add rental income or multi-generational living space while boosting property value.
With 15+ years in business, license #953868, and hundreds of completed projects, we're the adu construction contractor Northridge homeowners recommend to their neighbors.
ADU Construction Project Photos for Northridge Homeowners
A look at the kind of adu construction work our crew delivers for homeowners like you in Northridge.

















Why Northridge Homeowners Choose Us
- Full design-build service from plans to keys
- City permitting and California ADU code expertise
- Detached, attached, and garage-conversion ADUs
- Adds rental income and long-term property value
- Kitchens, baths, and utilities all handled in-house
How Our ADU Construction Process Works in Northridge
- 1Free feasibility consultation for your lot
- 2Design, engineering, and city permit approval
- 3Foundation, framing, and utility connections
- 4Full interior build-out: kitchen, bath, flooring, paint
- 5Final inspections and certificate of occupancy
"Excellent job from start to finish. Their team was professional, punctual, and respectful throughout. The workmanship was high quality, and the finished roof looks clean and well-installed. They communicated clearly about the process at each stage. Very satisfied and would recommend to anyone."
ADU Construction FAQs
How much value does an ADU add?+
In the LA market, a well-built ADU can add significant resale value and generate steady rental income. During your free consultation we'll walk through realistic numbers for your neighborhood.
Can you convert my garage into an ADU?+
Yes. Garage conversions are often the fastest and most cost-effective path to an ADU. We handle the structural work, insulation, utilities, and full interior finish.
How long does ADU construction take?+
Once permits are approved, most ADU builds take 4–6 months depending on size and site conditions. Garage conversions are typically faster. We manage the entire schedule for you.
Get your free adu construction estimate in Northridge today — call (800) 781-0937 or send us a message below.