ADU Construction Experts Serving Los Feliz
Los Feliz is historic character homes beneath Griffith Park, and we've tailored our adu construction approach to fit the homes and codes of this Central Los Angeles community.
Accessory dwelling units built from the ground up — design, permits, foundation, framing, and finish. Add rental income or multi-generational living space while boosting property value.
As a licensed California general contractor (#953868) with an A+ BBB rating, we back every Los Feliz project with written estimates, pulled permits, and real workmanship warranties.
ADU Construction Project Photos for Los Feliz Homeowners
A look at the kind of adu construction work our crew delivers for homeowners like you in Los Feliz.

















Why Los Feliz Homeowners Choose Us
- Full design-build service from plans to keys
- City permitting and California ADU code expertise
- Detached, attached, and garage-conversion ADUs
- Adds rental income and long-term property value
- Kitchens, baths, and utilities all handled in-house
How Our ADU Construction Process Works in Los Feliz
- 1Free feasibility consultation for your lot
- 2Design, engineering, and city permit approval
- 3Foundation, framing, and utility connections
- 4Full interior build-out: kitchen, bath, flooring, paint
- 5Final inspections and certificate of occupancy
"They arrived on time for the initial consult and paid close attention to detail throughout. Each person on the team was friendly and answered my questions. They upgraded the space with a new vanity, lighting, and fixtures. The finished product exceeded expectations. I will definitely call for future projects."
ADU Construction FAQs
How much value does an ADU add?+
In the LA market, a well-built ADU can add significant resale value and generate steady rental income. During your free consultation we'll walk through realistic numbers for your neighborhood.
Can you convert my garage into an ADU?+
Yes. Garage conversions are often the fastest and most cost-effective path to an ADU. We handle the structural work, insulation, utilities, and full interior finish.
How long does ADU construction take?+
Once permits are approved, most ADU builds take 4–6 months depending on size and site conditions. Garage conversions are typically faster. We manage the entire schedule for you.
Ready to get started in Los Feliz? Call (800) 781-0937 now for your free estimate.